Lundin Mining Interim Report

November 9, 2006
Nine Months Ended September 30, 2006

VANCOUVER, BRITISH COLUMBIA–(CCNMatthews - Nov. 9, 2006) - Lundin Mining Corporation (TSX:LUN)(AMEX:LMC) - 

(All amounts in US Dollars unless otherwise stated)
 



Financial Summary
                                    Three      Three       Nine       Nine
                                   months     months     months     months
                                    ended      ended      ended      ended
Millions of US$,                  Sept 30,   Sept 30,   Sept 30,   Sept 30,
 except per share data               2006       2005       2006       2005
--------------------------------------------------------------------------
Sales                                98.9       48.7      303.7      128.3
EBITDA(i)                            59.2       16.4      178.3       47.8
Net income                           30.7        9.6       89.4       15.7
Basic earnings per share             0.75       0.24       2.19       0.42
Diluted earnings per share           0.75       0.24       2.17       0.41
Cash provided by operating
 activities                          59.4        5.1      136.5       29.9
(i) Non GAAP measure



Supplementary financial information
regarding EuroZinc(i)


                                    Three      Three       Nine       Nine
                                   months     months     months     months
                                    ended      ended      ended      ended
                                  Sept 30,   Sept 30,   Sept 30,   Sept 30,
Millions of US$                      2006       2005       2006       2005
--------------------------------------------------------------------------
Sales                               133.1       83.7      390.5      217.4
EBITDA (ii)                         101.4       51.5      296.9      131.2
(i)     For further financial information regarding EuroZinc, please
        see EuroZinc's nine months 2006 report filed on www.sedar.com
(ii)    Non GAAP measure

 


CEO Comments

“During the period up to the end of October, Lundin Mining concluded two major transactions; the merger with the Canadian base metals producer EuroZinc, announced in August, a transaction which was formally closed in October and the finalizing of an agreement to acquire a 49% interest in the Ozernoe zinc project in Russia. The merger with EuroZinc creates a leading producer of zinc and copper, with high-quality assets and strong cash generation. The objective of the Company’s participation in the Ozernoe project is to develop the deposit into one of the world’s most significant zinc mining operations. We believe that these two transactions will provide for solid development and growth for our company both in the near and the longer term.”

Highlights

- On October 31st, 2006 Lundin Mining merged with the Canadian base metals producer EuroZinc Mining Corporation whose main assets consist of the Portuguese copper-zinc mine Neves-Corvo and the Aljustrel project, a zinc-lead-silver mine which will be re-opened in 2007. EuroZinc also controls significant exploration properties in Portugal.

- Lundin Mining appointed new members of the Board of Directors in connection with EuroZinc merger.

- A definitive agreement to acquire a 49% interest in the Ozernoe zinc project in Russia has been signed. The planning and work to construct an open pit zinc-lead-silver mine has begun and a preliminary estimate on mine production is for a 2009 startup.

- A decision was taken to invest $6.4 million in the processing plant at the Zinkgruvan mine to upgrade the ore dressing plant and an overhaul of the primary autogenous grinding mill. The upgrading is expected to result in a substantial reduction of noise from the mill, which is necessary in order to meet the new requirements of the environmental permit. The upgrade will also enable higher throughput in the mill and it is expected that the throughput in the mill will increase by 40,000 tonnes to an annual capacity of 850,000 tonnes.
 


Selected Financial Information
Thousands of USD


                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
                       Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
                          2006       2005       2006       2005       2005
--------------------------------------------------------------------------
Sales                $  98,941     48,683    303,657    128,253    192,073
Cost of sales        $ (35,364)   (28,692)  (109,706)   (68,401)   (98,710)
Exploration
 and project
 investigation       $  (1,700)    (1,374)    (5,352)    (4,540)    (7,146)
Administration
 and other
 income (expenses)   $  (2,700)    (2,233)   (10,308)    (7,508)   (10,864)
                     -----------------------------------------------------
EBITDA(i)            $  59,177     16,384    178,291     47,804     75,353


Depreciation of
 fixed assets        $  (5,382)    (5,435)   (14,783)   (14,236)   (20,267)
Amortization of
 mining rights       $  (9,410)    (8,522)   (27,272)   (22,076)   (31,732)
                     -----------------------------------------------------
EBIT(i)              $  44,385      2,427    136,236     11,492     23,354


Loss on copper and
 lead contracts (ii) $  (4,963)         -    (14,864)         -     (2,095)
Net interest and
 other financial
 items               $   1,137     11,280       (188)    12,710     22,806
                     -----------------------------------------------------
EBT(i)               $  40,559     13,707    121,184     24,202     44,065


Tax and
 non-controlling
 interest            $  (9,822)    (4,070)   (31,825)    (8,460)   (14,102)
                     -----------------------------------------------------
Net income for
 the period         $   30,737      9,637     89,359     15,742     29,963


Operating
 Cash Flow          $   59,381      5,062    136,500     29,902     66,665
Capital
 Expenditures       $   (6,621)    (3,595)   (19,780)    (8,655)   (17,957)


(i)  Non GAAP measures
(ii) Includes realized and unrealized results from metal hedges



Key Financial Data
                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
                       Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
                          2006       2005       2006       2005       2005
                     -----------------------------------------------------
Shareholders'
 equity/share,
 USD(i)              $    8.56       5.72       8.56       5.72       6.01
Basic
 earnings/share, USD $    0.75       0.24       2.19       0.42       0.78
Diluted
 earnings/share,
 USD                 $    0.75       0.24       2.17       0.41       0.78
Dividends                  Nil        Nil        Nil        Nil        Nil


Basic weighted
 average number of
 shares outstanding 40,870,635 40,332,593 40,768,393 37,679,028 38,416,486
Diluted weighted
 average number of
 shares outstanding 41,188,755 40,778,298 41,135,937 37,967,612 38,658,521


Number of shares
 outstanding at
 period end         40,908,331 40,478,831 40,908,331 40,478,831 40,693,831


(i) Shareholders'equity/share is defined as shareholders'equity divided by
total number of shares outstanding at period end.

 



MANAGEMENT’S DISCUSSION AND ANALYSIS

OF RESULTS OF OPERATIONS AND FINANCIAL CONDITION

(Amounts in United States Dollars unless otherwise indicated)

Nine months ended September 30, 2006

The Management’s discussion and analysis of the financial condition and results of the operations, analyzes the three and nine months ended September 30, 2006 and is dated November 8, 2006.

Recent Events

Merger with EuroZinc

On August 21, 2006 Lundin Mining Corporation (“Lundin Mining”) and EuroZinc Mining Corporation (“EuroZinc”) jointly announced that the two companies had reached an agreement to merge through a Plan of Arrangement to create a new global mining company. On October 19, Special Shareholders’ Meetings were held by both companies, and shareholders of both Lundin Mining and EuroZinc approved the merger. The transaction closed on October 31st. As of November 1, Lundin Mining is listed on American Stock Exchange (“AMEX” symbol LMC) in addition to the Toronto Stock Exchange (“TSX” symbol LUN) and the Stockholm Stock Exchange (“SSE” symbol LUMI).

The combined company, named Lundin Mining Corporation, creates a leading diversified copper and zinc producer, with approximately 1,500 employees. The two main assets in EuroZinc are the Neves-Corvo mine, which produces copper and zinc, and the Aljustrel mine which is currently being re-developed for a production startup in the second half of 2007 and will produce zinc, lead and silver. Both of these mines are located in southern Portugal.

Including the planned production at Aljustrel, Lundin Mining’s production is expected to be approximately 205,000 tonnes (450 million pounds) of contained zinc, 90,000 tonnes (200 million pounds) of contained copper, 80,000 tonnes (175 million pounds) of contained lead and 6 million ounces of contained silver on an annualized basis.

In addition to its producing mines Lundin Mining has an extensive exploration and development portfolio with exploration being conducted in Sweden and Ireland. As a result of the merger with EuroZinc, Lundin Mining will be able to access extremely interesting exploration areas in the pyrite rich belts in Portugal.

The combined balance sheet of the two companies is strong with total cash and short term investments, as of September 30, 2006, of $372 million and long term financial debt of $41 million. Pro forma sales for the period from January to September 2006 amounted to $694 million, with an operating cash flow of $339 million.

Colin K. Benner, the former CEO and Vice Chairman of EuroZinc, is Lundin Mining’s Vice Chairman and Chief Executive Officer effective November 1, 2006 while Karl-Axel Waplan becomes the new President and Chief Operating Officer of Lundin Mining effective November 1, 2006. EuroZinc and Lundin Mining are equally represented on the board of the combined company.

Appointment of new members of the Board of Directors

Following the merger, the new Lundin Mining Corporation directors are Lukas H. Lundin, Chairman, Colin K. Benner, Vice Chairman, William A. Rand, Brian D. Edgar, Tony O’Reilly Jr., John H. Craig, David F. Mullen, Dale C. Peniuk, Graham Mascall and Donald K. Charter.

The Ozernoe Project

Lundin Mining announced, on June 29, 2006, that the Company had signed a letter of intent to acquire a 49% interest in the Russian Ozernoe zinc project from IFC Metropol. The Company finalized negotiations with Metropol in September and the two parties have agreed on the terms of the transaction. During the past few months, a verification drilling program on the deposit was conducted, under the direct supervision of Lundin Mining personnel. Although the full analysis of the verification drilling program is not complete, the results to date validated all essential aspects of the historical drilling and exploration data that relate to the Ozernoe deposit.

A joint venture company is to be formed in which Lundin Mining will hold a 49% interest and Metropol will hold a 51% interest. Activities of the joint venture company will be the subject of a shareholders agreement. The consideration for the Lundin Mining’s 49% interest is $125 million of which a portion (approximately $10 million) will be dedicated to conducting a bankable feasibility study. The final purchase price is subject to adjustments based on recoverable zinc metal from a resource estimate classified and reported in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) confirmed by the bankable feasibility study. This acquisition is subject to all requisite regulatory approvals.

The final agreement also provides Lundin Mining with the right of first refusal which is valid for 9 months beginning in May, 2006, on the Kholodninskoye zinc project. Kholodninskoye, currently controlled by Metropol, is a zinc-lead-silver project located in the same region as the Ozernoe zinc project.

The Ozernoe zinc project is located approximately 250 km northeast of Ulan Ude, the capital of the Republic of Buryatia, in an area well known for containing mineral resources. The Indicated Mineral Resource is stated in the report on the assessment as 157 million tonnes grading 5.2% zinc and 1.0% lead at a reported cut-off of 2% zinc. Lundin Mining will have overall responsibility for management of the project, including project development, construction and operation of the mine once completed. A preliminary capital expenditure of $400 million has been estimated. Lundin Mining is responsible for arranging project financing in an amount equal to 60% of the cost required to put the Ozernoe project into commercial production. The remaining 40% will be injected as equity by Lundin Mining and Metropol on a pro rata basis.

For further information regarding the Ozernoe zinc project and the Mineral Resources, please see the news release issued by the Company on September 26, 2006. Dean Carville, a Qualified Person pursuant to NI 43-101, compiled the information relating to the Mineral Resources for the purposes of the Company’s September 26, 2006 news release relating to the Ozernoe project.

Investment in Zinkgruvan

During the quarter the Company decided to invest $6.4 million in the plant at Zinkgruvan in Sweden. The investment will be directed at a major upgrading of the ore dressing plant and an overhaul of the primary autogenous mill. The work to be done will result in a substantial noise reduction from the mill allowing it to meet the new noise level limits which are required by the environmental authorities as of November 1, 2006. Further, the investment is expected to accommodate an increase in the annual mill capacity of approximately 40,000 tonnes and create a more stable production flow. In addition, it is part of the preparation required in advance of the planned increase in Zinkgruvan’s output. In 2005, Zinkgruvan produced 803,883 tonnes of ore. The investment also provides for the possibility to install equipment for handling of external ores if necessary.

A decision has also been taken to install a variable speed control on the primary autogenous grinding mill. When the work is completed the milling capacity is expected to increase by 10% to 15% and should have a positive impact on cash flow.
 


Summary of operations - Metal production(i)


                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
                       Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
                          2006       2005       2006       2005       2005
--------------------------------------------------------------------------
Zinc
 (tonnes)  Zinkgruvan   15,374     15,205     56,159     53,432     69,981
           Storliden     8,220      6,564     22,096     24,765     32,024
           Galmoy       16,750     17,459     46,582     53,113     74,321
                     -----------------------------------------------------
           Total        40,344     39,228    124,837    131,310    176,326


Copper
 (tonnes)  Storliden     3,046      2,459      8,499      8,004     10,839


Lead
 (tonnes)  Zinkgruvan    7,373      6,709     23,197     28,178     36,674
           Galmoy        3,376      3,532     10,457     12,731     17,284
                     -----------------------------------------------------
           Total        10,749     10,241     33,654     40,909     53,958


Silver
 (ounces)  Zinkgruvan  432,400    383,533  1,285,156  1,380,019  1,866,061
           Galmoy       28,106     30,398    114,654    152,034    203,292
                     -----------------------------------------------------
           Total       460,506    413,931  1,399,810  1,532,053  2,069,353


--------------------------------------------------------------------------
(i) 100% of the production at Galmoy is included for 2005. This does not,
however, represent Lundin Mining's actual ownership during this period.
ARCON (owner of Galmoy) was aquired in April 2005.



Selected quarterly information


Three
months
ended       Sep-06  Jun-06  Mar-06  Dec-05  Sep-05  Jun-05  Mar-05  Dec-04
                                                              (iii)   (iii)
Sales
 ($'000)    98,941 112,918  91,798  63,820  48,683  43,537  36,033  22,465
Net income
 ($'000)(i) 30,737  37,161  21,461  14,221  9,637    3,170   2,935   2,090
Net income
 per share,
 basic
 ($)(i)(ii)   0.75    0.91    0.53    0.35   0.24     0.08    0.09    0.07
Net income
 per share,
 diluted
 ($)(i)(ii)   0.75    0.90    0.52    0.35   0.24     0.08    0.09    0.07


(i)   The Company has restated its unaudited interim consolidated financial
      statements for 2004 to allow for the retroactive effect of its change
      in accounting policy for exploration expenses.
(ii)  The net income per share (basic and diluted) is determined separately
      for each quarter. Consequently, the sum of the quarterly amounts may
      differ from the year to date amount disclosed in the unaudited
      interim consolidated financial statements as a result of
      using different weighted average numbers of shares outstanding.
(iii) Restated for the change in the reporting currency of the Company.

 


Results of operations

Sales

The increase in total sales for the third quarter of 2006, as compared to the third quarter of 2005, is due to significantly higher metal prices. The decreased sales in the third quarter of 2006, as compared to the second quarter of 2006, is primarily due to lower production and fewer shipments to customers from Zinkgruvan. The lower production at Zinkgruvan during July and August is due to the Swedish holiday period and the maintenance work that was carried out in the mine and the mill in connection with the holiday period.

Selling, general and administrative costs

The selling and general and administrative costs increased during the third quarter of 2006, as compared to the third quarter 2005 and the second quarter 2006, due to increased business activities at the corporate level in Sweden.

General Exploration and project investigation

Exploration costs decreased by approximately $400,000 in the quarter, as compared to the second quarter 2006, due to slightly lower drilling activities during the summer period. Compared to the third quarter of 2005 these costs increased by approximately $300,000 due to increased exploration activities in 2006 as compared to 2005.

Net income

The increase in net income for the third quarter of 2006, as compared to the third quarter of 2005, was due to significantly higher metal prices. Cost of sales have increased during the third quarter 2006 compared to the third quarter of 2005. This is mainly due to the profit sharing agreement with Boliden for the Storliden mine. The profit distributed to Boliden is recorded as cost of sales and has increased as the profitability of the Storliden mine has increased with the rising metal prices.

The decrease of net income for the third quarter of 2006 compared to the second quarter of 2006 is mainly due to lower quantities of concentrate sold from Zinkgruvan. This decrease has partially been offset by increased sales from Galmoy.

The losses on the copper and lead hedging contracts have negatively impacted the net income for 2006.
 


Zinkgruvan Mine


                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
(100 PERCENT           Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
 OF PRODUCTION)           2006       2005       2006       2005       2005
--------------------------------------------------------------------------
Ore milled (tonnes)    188,169    179,847    561,636    603,734    803,883
--------------------------------------------------------------------------
Grades per tonne
Zinc (%)                   8.8        9.4       10.7        9.5        9.4
Lead (%)                   4.4        4.3        4.7        5.2        5.1
Silver (g/t)                93         88         95         93         95
--------------------------------------------------------------------------
Recoveries
Zinc (%)                    92         93         94         93         93
Lead (%)                    89         90         88         90         89
Silver (%)                  77         78         75         77         76
--------------------------------------------------------------------------
Production
Zinc (tonnes)           15,374     15,205     56,159     53,432     69,981
Lead (tonnes)            7,373      6,709     23,197     28,178     36,674
Silver (oz)            432,400    383,533  1,285,156  1,380,019  1,866,061
Sales, TUSD          $  35,806  $  21,475  $ 135,356  $  62,178  $  85,683
Zinc Cash Production
 Cost, (US$/pound)(i)     0.55       0.28       0.50       0.25       0.27
--------------------------------------------------------------------------
(i) Zinc Cash Production Cost is the sum of direct costs, indirect cash
costs and by-product credits.

 


Production

Ore processed during the third quarter of 2006 was greater than the corresponding period in 2005. The performance of the mine and the mill during the third quarter 2006 was stable and on plan. Maintenance activities in the mine and the mill were carried out in July in connection with the Swedish summer holiday period.

Milling zinc head grades during the quarter decreased due to the mining sequence and are expected to stay at the same level during the fourth quarter of 2006. The lower amount of ore milled during the first nine months of 2006, as compared to the first nine months of 2005, has been offset by higher zinc grades and better recoveries. As a result, the total production of zinc metal contained in concentrate, for the first nine months of 2006, was approximately 2,700 tonnes greater than the comparable period last year. However, total production of lead contained in concentrate, for the first nine months of 2006, was 5,000 tonnes less than in the same period of 2005 and was primarily due to lower grades in combination with lower mill throughput.

The cash production cost during the quarter decreased by $0.04 per pound of payable zinc as compared to the second quarter of 2006 and increased by $0.25 per pound of payable zinc as compared to the third quarter of 2005. The increase in the cash cost is mainly due to increased smelter price participation charges, which are due to increased market prices for zinc. Also contributing to the increased cash production cost is the fact that a smaller portion of the company’s revenue came from lead, which has reduced by-product credits.

As a result of the significantly higher metal prices, sales increased by 65% during the third quarter this year compared to the third quarter of 2005 and 118% for the nine month period.

Production at Zinkgruvan during 2007 is expected to reach 850,000 tonnes of ore milled and mined. A further increase above the 850,000 tonne level for 2008 is currently being evaluated.
 


Storliden Mine


                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
(100 PERCENT           Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
 OF PRODUCTION)           2006       2005       2006       2005       2005
--------------------------------------------------------------------------
Ore milled (tonnes)    107,920     67,356    269,775    240,179    319,411
--------------------------------------------------------------------------
Grades per tonne
Copper (%)                 3.1        4.1        3.5        3.6        3.7
Zinc (%)                   8.5       10.8        9.1       11.2       10.9
--------------------------------------------------------------------------
Recoveries
Copper (%)                  91         91         91         92         92
Zinc (%)                    90         91         91         93         93
--------------------------------------------------------------------------
Production
Copper (tonnes)          3,046      2,459      8,499      8,004     10,839
Zinc (tonnes)            8,220      6,564     22,096     24,765     32,024
Sales, TUSD          $  28,992  $  12,370  $  87,022  $  40,629  $  58,959
Zinc Cash Production less than  less than  less than             less than
 Cost (US$/pound)(i)         0          0          0       0.03          0
--------------------------------------------------------------------------
(i) Zinc Cash Production Cost is the sum of direct costs, indirect cash
 costs and by-product credits.

 


Ownership

As of December 31, 2004, Lundin Mining held 74% of the shares of NAN, which is the owner of the Storliden Mine. During the first quarter of 2005, the Company acquired an additional 24% of the shares of NAN and initiated corporate procedures for the compulsory purchase of the remaining shares in NAN. As of June 30, 2006, Lundin Mining controlled 100% of the shares of NAN.

Production

The milled production of ore was higher during the third quarter of 2006, as compared to the third quarter of 2005 and the second quarter of 2006.

Zinc and copper mill head grades during the quarter were lower than the third quarter of 2005 and the second quarter of 2006. The Company decided to lower the cut-off grades due to the limited life of the mine and the current high metal prices and grades for zinc and copper for the remaining life of mine production is expected to be at this lower level.

The zinc cash costs for Storliden, during the third quarter of 2006, continued to be less than zero due to the high production of, and thus increased by-product credits of, copper. The income from copper was higher than the production costs and related smelting charges.

The Storliden ore production for 2006 is expected to reach a level well above the 2005 production of 319,411 tonnes. The planned closure of the mine is currently scheduled for the later part of the third quarter of 2007. Total costs for the closure of the operations are expected to be less than $500,000.
 


Galmoy Mine


                         Three      Three       Nine       Nine
                        months     months     months     months       Year
                         ended      ended      ended      ended      ended
(100 PERCENT           Sept 30,   Sept 30,   Sept 30,   Sept 30,    Dec 31,
 OF PRODUCTION)           2006       2005       2006       2005       2005
--------------------------------------------------------------------------
Ore milled (tonnes)    154,625    148,973    456,506    474,331    644,058
--------------------------------------------------------------------------
Grades per tonne
Zinc (%)                  13.0       13.6       12.3       13.3       13.7
Lead (%)                   3.2        3.5        3.5        4.0        4.0
--------------------------------------------------------------------------
Recoveries
Zinc (%)                    84         86         82         84         84
Lead (%)                    69         68         66         67         68
--------------------------------------------------------------------------
Production
Zinc (tonnes)           16,750     17,459     46,582     53,113     74,321
Lead (tonnes)            3,376      3,532     10,457     12,731     17,284


Sales, TUSD          $  32,870  $  14,850  $  81,154  $  44,741  $  68,289
Zinc Cash Production
 Cost (US$/pound)(i)      0.87       0.48       0.80       0.46       0.46
--------------------------------------------------------------------------
(i) Zinc Cash Production Cost is the sum of direct costs, indirect cash
costs and by-product credits.

 


Ownership

Lundin Mining and ARCON, the previous owner of the Galmoy mine, completed a merger during the second quarter of 2005. ARCON has been consolidated in the financial statements of Lundin Mining since May 1, 2005.

In order to provide comparable data, production figures and sales are presented at the mine level for all periods, including those that ended prior to the date the Company acquired the mine.

Production

Milled production for the third quarter of 2006 was 5,650 tonnes greater than the third quarter of 2005 and 8,800 tonnes higher than the second quarter of 2006. The mining operations were stable during the third quarter of this year.

Zinc mill head grades were lower during the third quarter of this year, as compared to the third quarter of last year, but higher than during the second quarter this year. The grade of the ore varies over time due to the mining sequence.

The improvement project in the mill is continuing and is resulting in higher utilization rates. It is planned to expand the lead circuit during the fourth quarter of 2006 with the installation of an additional flotation cell. With an increased flotation volume in the lead circuit, the mill will be able to increase recovery of lead and zinc by reducing the amount of zinc going into the lead concentrate. The previous layout of the lead circuit was inadequate to handle the volume of metal in the flow. Operational results from the expansion of the lead circuit are expected by the end of the fourth quarter of this year.

Recoveries were 84% for zinc and 69% for lead during the third quarter of this year which is greater than the average recoveries during 2006. The metallurgical performance in the mill varies between the different ore bodies at Galmoy. Further analyses is required, however, it has been established that the recoveries can vary between 64% and 90% depending on the ore body.

The management of Galmoy also initiated a cost reduction and efficiencv improvement program during the period. The program will cover all areas of operations including mine, mill and administration. A group procurement organization will also be established to coordinate the activities at Galmoy and Zinkgruvan. Operational results from the cost cutting program are expected during 2007.

Quarterly cash production costs at Galmoy decreased from $0.97 per payable pound of zinc during the second quarter 2006 to $0.87 per payable pound of zinc during the third quarter of 2006 due to higher production of zinc and lead. The high cash costs are mainly due to the price participation element of the smelter treatment charges.

Exploration in Sweden

Drilling was the focus of exploration activities in Sweden during the third quarter with a total of 4,913 metres drilled in 27 diamond drill holes using four rigs, of which two operated in the Skellefte district and two in the Bergslagen district.

The Copperstone-Eva Project

The process of obtaining a mining permit for the Eva Discovery deposit is in progress. A proposed plan to mine Eva in conjunction with the Norrliden deposit (see below) is being studied.

Using the Eva Discovery as an exploration model, reconnaissance drilling at the Lillsandberget target, located at the north end of the Copperstone area, encountered broad zones of alteration and minor sulphide mineralization, including strongly chloritized and sericitized rhyolite volcanics hosting pyrite, sphalerite and chalcopyrite stringers beneath extensive hanging wall cover rocks. Once winter conditions allow access, two follow-up holes will be drilled in the vicinity of the copper mineralization (2.1% copper over 3 metres from 66.85 metres depth) intercepted last quarter as previously reported.

The Eliasro target was defined by a discrete 2005 airborne Electro Magnetic (“EM”) anomaly and is located 10 km north of the main Copperstone target area. The first test hole of the Eliasro target intercepted over 260 metres of altered siliceous breccia hosting widespread minor sulphide mineralization, including sphalerite. Downhole EM and further drilling are planned in the immediate Eliasro target area.

Near-mine Exploration at Storliden

No significant sulphides were encountered in the final exploration drill holes to test for a northwest extension of the deposit. No other targets remain within the near-mine area. The potential for an extension of the Storliden deposit still exists but well beyond the reach of the present workings that would allow for additional mine life.

The Norrliden Deposit

Two pilot holes for geophysical surveys were completed although the second hole was not able to get to the final planned depth. Downhole time-domain electromagnetics (“TEM”) surveys failed to indicate downdip extensions of the known mineralization. Further surveys using large loop TEM methods are presently being carried out. One identified TEM anomaly, located 250 metres to the southwest of the deposit, will be tested at depth by drilling. A pre-feasibility mine study has been initiated for the Norrliden deposit.

The Lappvattnet Nickel Project

The earn-in option agreement with Blackstone Venture Corp. has been finalized. It is planned that Blackstone will start field work, including an airborne EM survey, in the early part of the fourth quarter.

The Norrbotten Copper-Gold Project

No further work by Lundin Mining is planned. A partner company to finish the earn-in agreement with Anglo-Rio on the optioned Rakkurijarvi property is being selected.

Zinkgruvan-Bergslagen Exploration

Two drill rigs operated during this period in the Bergslagen region (16 diamond drill holes totaling 2,568 metres), mostly close to the Zinkgruvan mine at the Marketorp, Meltorp and the Hulutorp target and in the central part of the Bergslagen district at the Frukostmossen target.

At Hulutorp, drilling intercepted a zone which was found to host minor copper mineralization. The drilling is testing an area where a zinc-bearing block was found by a prospector. Drilling continues at Hulutorp. Drilling at the Marketorp and Meltorp areas, targeting possible extensions of known mineralised zones, failed to intersect significant mineralisation. No further work is planned in these areas. At Frukostmossen, four of the five planned drill holes have been completed. Only sporadic disseminated magnetite hosted by andesitic volcanics has been found. The source of the copper-rich block found in the target area remains to be discovered. Next drilling will target at the Tybble and Krigstjarn target areas.

At Zinkgruvan, a directional drilling program is being designed to delineate the extent of the new zone of mineralization, known as the deep Dalby zone, which was discovered and reported on last quarter. This directional drilling program will start in the first quarter of 2007.

Exploration in Ireland

Exploration at Galmoy

A total of 3,849 metres in 27 holes was drilled in the Galmoy area in the third quarter of 2006. Of these, 25 holes, totalling 2,807 metres, were drilled in the near vicinity of the Galmoy mine. The remaining two holes, totalling 1,042 metres, were drilled at the Rapla target located 5 km to the northeast of the mine.

Of the holes drilled in the vicinity of the mine, 15 were drilled mainly in a 100x100 metres grid in a previously undrilled area close to, and southwest of, the CW South Zone and 12 holes were drilled in north-south fences of holes to the west of the G Orebody. Two of the holes located in the area southwest of the CW South Zone intersected significant mineralization, one of which was resource grade: GY481, 73.80-77.40 metres depth, 3.60 metres at 9.65% zinc, 1.10% lead, 10.65 grams/tonnes silver. However, follow-up by four closer spaced holes proved this occurrence to be isolated. None of the holes drilled to the west of the mine intersected any significant mineralization.

At Rapla, one of the two completed holes again intersected the major fault believed to be the source of the mineralizing fluids and tested the Lisduff Oolite within the footwall of the fault - at Lisheen some resource-grade mineralization is hosted within the Lisduff Oolite in a comparable structural position - but no mineralization was found. The second hole intersected the base of Waulsortian 200 metres west of, and along strike from, the hole that intersected resource grade mineralization reported upon last quarter but only intersected minor pyrite mineralization.

In the fourth quarter, two additional drill rigs will be added to the three rigs already employed on the Galmoy block in order to speed up the target testing process.

The Keel Property

Two drill holes, totalling 1,015 metres, were completed. The first of these holes, which was underway last quarter, was drilled to test the deeper Pale Beds which hosts the world-class Tara mine deposit. A very extensive zone of intense dolomitic alteration, brecciation and faulting was intercepted in this hole, all considered to be favourable indicators. In addition, the digital capture of the historic Keel deposit drill data was completed in September and several drill targets down-dip and along strike from the known deposit have been generated. Drill-testing of these targets is expected to begin in the fourth quarter.

Other Projects

Ozernoe, Russia

A resource verification drill program, started at the end of the first quarter of 2006, is nearing completion. A total of 2,893 metres was drilled in 15 holes with a total of 2,142 samples being dispatched to Russian laboratories for sample preparation and assay zinc - lead analysis. Returned pulps were analysed using a portable X-Ray Fluorescence (“XRF”) to give rapid semi-quantitative base metal results and to provide independent Quality Assurance/Quality Control.

In August, Lundin Mining visited the Kholodninskoye zinc-lead-silver deposit located in northern Buryatia and also owned by Metropol. Lundin has a right of first refusal on Kholodninskoye. A technical review of the verification drilling at Ozernoe as well as construction, mining and beneficiation planning meetings in Ulan Ude were carried out. A two-stage in-fill resource definition drilling program (first stage of 3,800 metres for 18 holes) was also designed and permitted by the relevant government authorities in the third quarter. The in-fill drilling will concentrate on taking large diameter, closely spaced drill core for laboratory metallurgical and geostatistical test work and angled drilling for geotechnical and structural control information.

At the end of the third quarter, three resource verification drill holes for 1,040 metres remained to be completed. However, one resource in-fill drill hole had been completed for 149 metres. Of the 14 batches of drill core samples, 10 have been prepped and analysed by XRF, and zinc - lead assay results from 4 of the batches have been reported by the Russian laboratories. These preliminary analytical results broadly confirm and corroborate the previous works carried out by the Russian State enterprise’s exploration program, although there is some variability in the results that can be largely accounted for by geological reasons.

Toral, Spain

Field work preparations, including drill program design, drill contractor selection and logistical support, is in progress while official demarcation of the awarded license is awaited from the regional government authority. It is planned that a first stage, 6,000 metre, selective resource in-fill and exploration drill program will be carried out once final permits have been received.

Metal prices and treatment charges

Compared to the third quarter of 2005 the price of zinc has increased considerably. The price of zinc has also continued to rise compared to the second quarter of this year. The reduction in inventory levels of zinc on the London Metal Exchange (“LME”), seen during 2005 and the first half of 2006, has continued during the third quarter of 2006. Currently the LME zinc inventory is approximately 100,000 tonnes compared to 530,000 tonnes as of September 30, 2005. The price of zinc is currently trading above 4,450 US$/tonne (2.02 US$/pound). The price of copper has followed the same pattern as zinc and increased significantly compared to 2005. Copper is currently trading around 7,350 US$/tonne (3.33 US$/pound). Lead has also followed the same pattern but not to the same extent as zinc and copper. However, lead has increased significantly during October this year and is currently trading around 1,725 US$/tonne (0.78 US$/pound).
 


                      Third   Third            Nine    Nine           Year
(Average LME        quarter quarter  Change  months  months  Change  ended
 / LBM)                2006    2005       %    2006    2005       %   2005
--------------------------------------------------------------------------
Zinc     US$/pound     1.53    0.59    +160    1.35    0.59    +129   0.63
         US$/tonne    3,363   1,295    +160   2,966   1,295    +129  1,381


Lead     US$/pound     0.54    0.40     +34    0.53    0.43     +24   0.44
         US$/tonne    1,189     890     +34   1,177     952     +24    976


Copper   US$/pound     3.48    1.70    +104    3.00    1.57     +90   1.67
         US$/tonne    7,670   3,755    +104   6,607   3,471     +90  3,678


Silver   US$/oz       11.70    7.07     +66   11.22    7.06     +59   7.31
--------------------------------------------------------------------------

 


The base treatment charges (“TC”) for zinc has continued downwards based on a deficit of concentrate and the Company believes the TC for zinc will remain at historically low levels over the next couple of years. It should be noted that the smelters benefit from higher zinc prices due to the price participation mechanism in the agreements between the mines and the smelters.

Outlook

The outlook for metal prices for 2007 is, in general, very positive. The growth in demand, especially from Asia, is expected to continue and this is not expected to be met by a similar increase in production. Accordingly, the Company expects that the price for zinc, copper and lead will remain very strong during the rest of 2006 and for 2007.

It should be noted that the price of silver for all silver production from Zinkgruvan going forward has been fixed by the silver sale transaction with Silver Wheaton whereby Zinkgruvan receives $3.90 cash per ounce or the market price if the market price of silver is less than $3.90 per ounce. The up-front cash payment received from Silver Wheaton in December 2004 has been deferred on the balance sheet and is realized in the income statement when the actual deliveries of silver occur.

Currencies
 


                   Third    Third             Nine     Nine           Year
                 quarter  quarter  Change   months   months  Change  ended
(Average)           2006     2005       %     2006     2005       %   2005
--------------------------------------------------------------------------
SEK per US$         7.24     7.68      -6     7.47     7.31      +2   7.47


SEK per CA$         6.46     6.39      +1     6.60     5.97     +11   6.17


CA$ per US$         1.12     1.20      -7     1.13     1.22      -7   1.21


US$ per Euro        1.27     1.22      +5     1.24     1.26      -1   1.25

 


Liquidity and capital resources

Working Capital, including cash and short term financial debt

As at September 30, 2006, the Company had working capital of $167.6 million compared to working capital of $126.5 million as at June 30, 2006 and $63.8 million as at December 31, 2005. Cash was $176.5 million as at September 30, 2006 compared to $131.5 million as at June 30, 2006 and $74.4 million as at December 31, 2005. The change in the working capital is primarily due to the positive cash flow generation from operations.

Accounts receivable

Accounts receivable decreased to $40.3 million as at September 30, 2006 compared to $47.6 million as at June 30, 2006. The decrease is due to lower accounts receivable at Zinkgruvan which is due to lower volumes of sold concentrate. As at December 31, 2005, the balance was $20.2 million. Continued higher metal prices have increased the accounts receivables at the operations compared to December 31, 2005.

Current liabilities

Current liabilities decreased to $61.3 million as at September 30, 2006 compared to $62.4 million as at June 30, 2006. As of December 31, 2005, the balance was $41.8 million. The increase compared to year end 2005 is primarily due to increased current tax liabilities which are due to the taxable income generated during 2006.

Long-term liabilities and provisions

Long-term liabilities and provisions increased during 2006 compared to December 31, 2005. The future income tax liabilities have increased as a result of the income generated during 2006. The conversion of Swedish currency to USD also impacts the long-term liabilities and provisions. The strengthening Swedish currency during 2006 has increased the long-term liabilities when the Swedish amounts are expressed in USD.

Currency hedging and hedging of metal prices

The Company had no outstanding currency hedging contracts as of September 30, 2006. As of the same date, Lundin Mining had entered into the following metal hedging contracts. A portion of the remaining expected payable copper production for 2006 has been hedged. The hedged amount for lead is approximately 50% for the remaining part of 2006 and 30% for 2007.
 


Hedges 2006                 Q4-2006
-----------------------------------
Copper             Volume
                  (tonnes)      625


Forward sales   US$/pound      1.74
                US$/tonne     3,825
-----------------------------------


Lead               Volume
                  (tonnes)    6,000


Bought Put      US$/pound      0.43
 Options        US$/tonne       950


Sold Call       US$/pound      0.53
 Options        US$/tonne     1,170
-----------------------------------



                                                              Total volume
Hedges 2007             Q1-2007   Q2-2007   Q3-2007   Q4-2007         2007
--------------------------------------------------------------------------
Lead             Volume
                (tonnes)  3,600     3,600     3,600     3,600       14,400


Bought Put    US$/pound    0.49      0.49      0.49      0.49
 Options      US$/tonne   1,082     1,082     1,082     1,082


Sold Call     US$/pound    0.57      0.57      0.57      0.57
 Options      US$/tonne   1,250     1,250     1,250     1,250
--------------------------------------------------------------------------

 


The mark-to-market valuation of the outstanding contracts resulted in unrealized loss for accounting purposes of $7.0 million as of September 30, 2006.

Major contractual obligations

The Company has agreed to deliver all future production of silver from Zinkgruvan to Silver Wheaton, with a delivery guarantee of a minimum of 40 million ounces of silver over a 25-year period. If at the end of the 25-year period, the Company has not delivered the minimum of 40 million ounces, then it has agreed to pay to Silver Wheaton $1.00 per ounce of silver not delivered.

The Storliden mine was developed by, and is being operated pursuant to an agreement with, Boliden Mineral AB (“Boliden”). The Company’s subsidiary, NAN, is the operator of the mine and Boliden is the main contractor of the mine. Ore is being processed at the Boliden Area Operations mill. After all costs of the operation are paid, the remaining cash flow is shared in the ratio two-thirds/one-third to NAN and Boliden respectively. The fee charged by Boliden for mining the mine is cost plus 15%. For one-fifth of the Storliden deposit, NAN pays a 1.5% annual royalty on the Net Smelter Return to Cogema SA.

During 2006, a major Swedish bank has issued a bank guarantee of SEK 80 million (approx. $10.9 million) related to the future reclamation costs at Zinkgruvan. The beneficiary of the guarantee is the Swedish authorities. Lundin Mining has agreed to indemnify the Swedish bank for the corresponding amount of the guarantee.

Related party transactions

The Company has transactions with related parties that are disclosed in Note 5 of the consolidated interim financial statements.

Outstanding share data

As at November 8, 2006, the Company had 94,599,847 common shares outstanding and 1,761,223 share options outstanding under its stock-based incentive plans.

Risks

The Company’s properties/operations are subject to certain risks including but not limited to government regulations relating to mining, metal prices and currency rate fluctuations, competition, receipts of permits and approval from government authorities, operating hazards and other risks inherent to the exploration, development and operation of a mine. The Company’s risk factors are more fully described in the Company’s Annual Information Form.

Cautionary note regarding forward-looking statements

Certain statements contained in the foregoing Management’s Discussion and Analysis and elsewhere constitute forward-looking statements. Such forward-looking statements involve a number of known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made, and readers are advised to consider such forward-looking statements in light of the risks set out above.

Non-GAAP Performance Measures

Zinc Cash Production Cost (US$/pound) is a key performance measure that management uses to monitor performance. Management uses these statistics to assess how well the Company’s producing mines are performing compared to plan and to assess overall efficiency and effectiveness of the mining operations. These performance measures have no meaning within Canadian Generally Accepted Accounting Principles (“GAAP”) and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with Canadian GAAP.

The following table presents the calculation of Zinc Cash Production Costs (US$/pound) for each of the Company’s operations for the periods indicated.

Reconciliation of unit cash costs of zinc to consolidated statements of operations

Thousands of US dollars, except zinc cash production cost per pound
 


                         Three Months Ended              Nine Months Ended
                              30 Sept, 2006                  30 Sept, 2006
               Zinkgruvan Storliden  Galmoy   Zinkgruvan Storliden  Galmoy
--------------------------------------------------------------------------
Operating
 expenses,
 excluding
 depreciation      8,295     13,190  13,467       30,758    39,766  39,436
Treatment
 charges for
 zinc             13,741      6,310  16,577       51,188    16,603  39,964
By-product
 credits          (7,455)   (18,373) (2,876)     (26,747)  (47,295) (8,998)
Other items
 effecting cash
 production costs  1,356     (9,235)    (51)      (2,091)  (24,271) (1,027)
--------------------------------------------------------------------------
Total             15,937     (8,108) 27,117       53,108   (15,197) 69,375


Zinc metal
 payable (tonnes) 13,038      6,989  14,136       47,716    18,787  39,346
Zinc metal
 payable
 (000's pounds)   28,735     15,403  31,156      105,165    41,406  86,719
--------------------------------------------------------------------------
--------------------------------------------------------------------------
Zinc cash
 production cost
 per pound(i)       0.55      (0.53)   0.87         0.50     (0.37)   0.80
--------------------------------------------------------------------------
--------------------------------------------------------------------------
(i) of which
treatment charges
for zinc comprise   0.48       0.41    0.53         0.49      0.40    0.46



Lundin Mining Corporation
INTERIM CONSOLIDATED BALANCE SHEETS
(Unaudited)


                              As at Sept 30,  As at Sept 30,  As at Dec 31,
Thousands of US dollars  Notes         2006            2005           2005
-----------------------------------------------------------  -------------
ASSETS
Current assets
Cash                            $   176,469   $      67,288  $      74,409
Accounts receivable                  40,287          17,158         20,231
Investments                  3            -           5,553              -
Inventories                          10,687           9,213          9,609
Prepaid expenses                      1,459           1,973          1,340
                                -----------   -------------  -------------
                                    228,902         101,185        105,589
Fixed assets
Long term receivables                 9,134           5,027          5,121
Investments                          23,414           1,723          3,349
Properties, plant
 and equipment                      279,683         300,160        288,217
Future income tax assets              3,337           6,223          2,753
Deferred financing costs              1,871           1,821          1,785
                                -----------   -------------  -------------
                                    317,439         314,954        301,225
                                -----------   -------------  -------------
                                $   546,341   $     416,139  $     406,814
                                -----------   -------------  -------------
                                -----------   -------------  -------------
LIABILITIES
Current liabilities
Accounts payable                $     7,635   $       8,002  $      10,453
Accrued liabilities                  27,394          16,898         15,369
Income taxes payable                 23,507          12,084         13,434
Current portion of
 deferred revenue                     2,728           3,396          2,509
Short-term credit facility                -          23,436              -
                                -----------   -------------  -------------
                                     61,264          63,816         41,765
Long-term liabilities
Capital lease obligation              1,477               -          1,547


Provisions
Deferred revenue             3       58,340          56,778         55,667
Provisions for pension               13,682          12,085         12,111
Asset retirement
 obligations and other
 provisions                          17,673          16,718         16,093
Future income tax
 liabilities                         43,591          34,473         34,488
                                -----------   -------------  -------------
                                    133,286         120,054        118,359


NON-CONTROLLING INTEREST                  -             532            627


SHAREHOLDERS'EQUITY
Share capital                4      245,739         242,796        243,305
Contributed surplus                   1,287           1,552          1,357
Retained earnings                   114,612          11,032         25,253
Cumulative translation
 adjustments                        (11,324)        (23,643)       (25,399)
                                -----------   -------------  -------------
                                    350,314         231,737        244,516
                                -----------   -------------  -------------
                                $   546,341   $     416,139  $     406,814
                                -----------   -------------  -------------
                                -----------   -------------  -------------


See accompanying notes
Approved by the Board:


Lukas H. Lundin                    William A. Rand


In accordance with National Instrument 51-102 of the Canadian Securities
Administrators, readers are advised that these financial statements have
not been subject to review by the Company's auditors.



Lundin Mining Corporation
INTERIM CONSOLIDATED STATEMENTS OF OPERATIONS
(Unaudited)
                       Three      Three        Nine        Nine
                      months     months      months      months     Twelve
Thousands of           ended      ended       ended       ended     months
 US dollars        September  September   September   September      ended
(except per               30,        30,         30,         30,    Dec 31,
 share amounts)         2006       2005        2006        2005       2005
---------------------------------------  ----------  ---------- ----------
Sales             $   98,941     48,683     303,657     128,253    192,073
Cost of sales        (50,156)   (42,649)   (151,761)   (104,713)  (150,709)


                  ---------- ----------  ----------  ---------- ----------
Gross margin          48,785      6,034     151,896      23,540     41,364
                  ---------- ----------  ----------  ---------- ----------
Expenses
General
 exploration and
 project
 investigation        (1,700)    (1,374)     (5,352)     (4,540)    (7,146)
Selling,
 general and
 administration       (3,129)    (2,065)     (8,165)     (6,860)    (8,976)
Stock based
 compensation            429       (168)     (2,143)       (648)    (1,887)
                  ---------- ----------  ----------  ---------- ----------
                      (4,400)    (3,607)    (15,660)    (12,048)   (18,009)
                  ---------- ----------  ----------  ---------- ----------
Other
 income/expenses
Interest and
 other income          1,027        268       2,504         752      1,465
Interest and bank
 charges                   -       (132)          -        (206)      (511)
Foreign exchange
 gains/(losses)          110        (57)     (2,692)        963      4,041
Loss on copper
 and lead
 contracts            (4,963)         -     (14,864)          -     (2,095)
                  ---------- ----------  ----------  ---------- ----------
                      (3,826)        79     (15,052)      1,509      2,900
                  ---------- ----------  ----------  ---------- ----------
Income before
 undernoted           40,559      2,506     121,184      13,001     26,255
Gain on sale of
 investments               -     11,201           -      11,201     17,810
Income before
 income taxes and
 non-controlling
 interest             40,559     13,707     121,184      24,202     44,065
Income taxes          (9,814)    (4,019)    (31,644)     (7,740)   (13,291)
Non-controlling
 interest                 (8)       (51)       (181)       (720)      (811)
Net income for
 the period       $   30,737      9,637      89,359      15,742     29,963
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------
Retained earnings
 (deficit)
 beginning of
 period               83,875      1,395      25,253      (4,710)    (4,710)
Net income            30,737      9,637      89,359      15,742     29,963
Retained earnings
 end of period    $  114,612     11,032     114,612      11,032     25,253
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------
Basic earnings
 per share        $     0.75       0.24        2.19        0.42       0.78
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------
Diluted earnings
 per share        $     0.75       0.24        2.17        0.41       0.78
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------
Basic weighted
 average number of
 shares
 outstanding      40,870,635 40,332,593  40,768,393  37,679,028 38,416,486
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------
Diluted weighted
 average number
 of shares
 outstanding      41,188,755 40,778,298  41,135,937  37,967,612 38,658,521


See accompanying notes



Lundin Mining Corporation
INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS'EQUITY
(Unaudited)


                                   Contri-            Cumulative
Thousands of                Share   buted  Retained  translation
 US dollars               capital surplus  earnings  adjustments     Total
--------------------------------------------------------------------------


As at December 31, 2004 $ 170,278     855    (4,710)         (75)  166,348
                        --------------------------------------------------


New share issues           14,727                                   14,727
Translation adjustments                                   (3,127)   (3,127)
Net income for the period                     2,935                  2,935
                        --------------------------------------------------
As at March 31, 2005     $185,005     855    (1,775)      (3,202)  180,883


New share issues           56,347                                   56,347
Exercise of stock options       8                                        8
Stock based compensation              480                              480
Translation adjustments     1,083                        (19,173)  (18,090)
Net income for the period                     3,170                  3,170
                        --------------------------------------------------
As at June 30, 2005      $242,443   1,335     1,395      (22,375)  222,798


Exercise of stock options     353                                      353
Stock based compensation              217                              217
Translation adjustments                                   (1,268)   (1,268)
Net income for the period                     9,637                  9,637
                        --------------------------------------------------
As at September 30, 2005  242,796   1,552    11,032      (23,643)  231,737


Exercise of stock options   1,004                                    1,004
Stock based compensation              393                              393
Transfer of contributed
 surplus on exercise
 of stock options             588    (588)                               -
Translation adjustments    (1,083)                        (1,756)   (2,839)
Net income for the period                    14,221                 14,221
                        --------------------------------------------------
As at December 31, 2005   243,305   1,357    25,253      (25,399)  244,516


Stock based compensation              243                              243
Translation adjustments                                    2,289     2,289
Net income for the period                    21,461                 21,461
                        --------------------------------------------------
As at March 31, 2006    $ 243,305    1,600   46,714      (23,110)  268,509


Stock based compensation               203                             203
Exercise of stock options     661                                      661
Transfer of contributed
 surplus on exercise of
 stock options                143     (143)                              -
Translation adjustment
 for the period                                          10,666     10,666
Net income for the period                    37,161                 37,161
                        --------------------------------------------------
As at June 30, 2006     $ 244,109    1,660   83,875     (12,444)   317,200


Stock based compensation                29                              29
Exercise of stock options   1,228                                    1,228
Transfer of contributed
 surplus on exercise                                                     -
 of stock options                      402     (402)                     -
Translation adjustment
 for the period                                           1,120      1,120
Net income for the period                    30,737                 30,737
                        --------------------------------------------------
As at
 September 30, 2006     $ 245,739    1,287  114,612     (11,324)   350,314



Lundin Mining Corporation
INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)
                       Three      Three        Nine        Nine     Twelve
                      months     months      months      months     months
                       ended      ended       ended       ended      ended
Thousands of US      Sept 30,   Sept 30,    Sept 30,    Sept 30,    Dec 31,
 dollars                2006       2005        2006        2005       2005
--------------------------------------------------------------------------
Cash flow from
 operating
 activities
Net income for
 the period       $   30,737    $ 9,637    $ 89,359    $ 15,742   $ 29,963
Add/(deduct
 non-cash items
Amortization of
 deferred revenue       (709)      (888)     (2,147)     (2,116)    (3,083)
Depreciation and
 amortization         14,792     13,957      42,054      36,312     51,999
Stock based
 compensation             29        168         475         648      1,090
Loss (Gain) on
 asset
 dispositions              3    (11,201)         85     (11,201)   (17,810)
Future income
 taxes                 9,204      4,019       8,910       7,740       (769)
Provisions for
 pensions and
 other                  (380)       333         512          45        902
Net changes in
 non-cash working
 capital items         5,705    (10,963)     (2,748)    (17,268)     4,373
Total cash-flow
 from operating
 activities           59,381      5,062     136,500      29,902     66,665
Cash flow from
 (used in)
 financing
 activities
Common shares
 issued                1,630        353       2,434         353      1,365
Repayment of debt        (72)         -        (145)    (17,496)   (40,514)
Proceeds from
 loan facility             -          -           -      23,018     23,018
                  --------------------------------------------------------
Total cash-flow
 from (used in)
 financing
 activities            1,558        353       2,289       5,875    (16,131)
Cash flow used in
 investing
 activities
Acquisition of
 subsidiaries, net
 of cash acquired     (1,965)         -      (1,965)    (66,476)   (70,849)
Mining properties
 and related
 expenditures         (6,621)    (3,595)    (19,780)     (8,655)   (17,957)
Securities held
 as investments       (7,844)    (1,723)    (22,963)     (1,723)    (4,294)
Proceeds on asset
 dispositions              -     25,214         132      25,214     37,080
                  --------------------------------------------------------
Total cash-flow
 used in investing
 activities          (16,430)    19,896     (44,576)    (51,640)   (56,020)
Impact of foreign
 exchange on cash
 balances                478        179       7,847      (3,529)    (6,785)


 Increase/(decrease)
 in cash              44,987     25,490     102,060     (19,392)   (12,271)
Cash, beginning
 of period           131,482     41,798      74,409      86,680     86,680
                  --------------------------------------------------------
Cash, end of
 period           $  176,469 $   67,288  $  176,469  $   67,288 $   74,409
                  ---------- ----------  ----------  ---------- ----------
                  ---------- ----------  ----------  ---------- ----------


Supplementary
 information
 regarding
 non-cash
 transactions
FINANCING AND
 INVESTING
 ACTIVITIES
Common shares
 issued for
 acquisition of
 NAN/Arcon        $        - $        -  $        -  $   72,157 $   71,074
Equipment
 acquired through
 capital lease    $        - $        -  $        -  $        - $    1,547
                  $        - $        -  $        -  $   72,157 $   72,621
OTHER
 SUPPLEMENTARY
 INFORMATION
Interest paid     $        3 $       48  $       14  $      112 $      417
Taxes paid        $      124 $        -  $   13,355  $        - $    3,219


See accompanying notes

 


Lundin Mining Corporation

NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the nine months ended September 30, 2006 and 2005 (Unaudited)

(In United States dollars)

1. Basis of Presentation

The unaudited interim consolidated financial statements of Lundin Mining Corporation (the “Company” or “Lundin Mining”) are prepared in accordance with Canadian generally accepted accounting principles using the same accounting policies and methods of application as those disclosed in Note 2 to the Company’s consolidated financial statements for the year ended December 31, 2005.

These interim consolidated financial statements do not contain all of the information required by Canadian generally accepted accounting principles for annual financial statements and therefore should be read in conjunction with the Company’s 2005 annual audited consolidated financial statements.

These unaudited interim consolidated financial statements reflect all normal and recurring adjustments which are, in the opinion of management, necessary for a fair presentation of the respective interim periods presented.

2. Acquisitions

(a) North Atlantic Natural Resources AB

On December 30, 2004, the Company acquired all of Boliden Mineral AB’s (“Boliden’s”) 11,537,000 shares in NAN, representing 36.9% of the outstanding shares and votes. The consideration for all of Boliden’s NAN shares amounts to 2,176,800 newly issued Lundin Mining shares, representing 6.5% of the shares and votes in Lundin Mining on an undiluted basis. Applying the market price on the Toronto Stock Exchange for Lundin Mining’s shares of CAD $10.40 (SEK 56.32), the total consideration for all of Boliden’s NAN shares was CAD $22,638,720 (approximately $18.4 million).

Prior to the acquisition of Boliden’s NAN shares, Lundin Mining held 11,580,000 shares in NAN, representing 37.1% of the shares and votes. Following the acquisition, Lundin Mining held 23,117,000 shares in NAN, representing 74.0% of the shares. A public offer (the “Offer”) in line with the Swedish Industry and Commerce Stock Exchange Committee’s (Naringslivets Borskommitte (NBK)) mandatory bid rules was made to all remaining NAN shareholders in February 2005. Shareholders holding 7,367,854 shares, representing 23.6% of the total number of shares and votes of NAN, accepted the Offer. Combined with the 23,117,000 shares held by the Company prior to the Offer, Lundin Mining held 30,484,854 shares in NAN, representing 97.6% of the total number of shares and votes. As consideration for the 23.6% the Company issued an additional 1,383,321 common shares at a price of CAD$13.25 (US$10.65) per share, being the average closing price of the Company’s shares on the Toronto Stock Exchange the two days before, the day of, and two days after the date of announcement.

As of September 30, 2006, Lundin Mining controls 31,240,710 shares in NAN which equals 100% of the outstanding shares. The remaining 2.4% of the shares were obtained through the Swedish corporate procedures for compulsory purchase during the second quarter 2006. In order to achieve ownership of these shares Lundin Mining has provided the trustee in the arbitration proceedings with a bank guarantee in the amount of $2.0 million. The final purchase price per share has been set to SEK 13.10 ($1.80) plus interest by the arbitration board and is expected to be paid in December 2006.

The acquisition of the outstanding shares has been accounted for using the purchase method. The allocation of the fair value of the net assets acquired is as follows:
 


Purchase price:
 Consideration paid with new shares         $    33,420,000
 Consideration paid in cash                       2,071,000
 Acquisition expenses paid in cash                2,419,000
                                            ---------------
                                            $    37,910,000
                                            ---------------
                                            ---------------


Net assets acquired:
 Cash                                       $     5,195,000
 Other working capital, net                       2,822,000
 Mining properties                               44,204,000
 Property, plant and equipment                      198,000
 Future income tax liabilities                   (6,778,000)
 Other provisions                                  (300,000)
                                            ---------------
                                            $    45,341,000
Less:
 Carrying value of prior investment in NAN       (7,431,000)
                                            ---------------
                                            $    37,910,000
                                            ---------------
                                            ---------------

 


(b) ARCON International Resources Plc

On March 3, 2005 the Board of Lundin Mining and the Board of ARCON announced that they had reached an agreement in principle on the terms of a recommended merger of the two companies.

Lundin Mining offered (the “Merger Offer”) to acquire all of the issued and to be issued ARCON shares on the following basis: $36.2198 cash (the “cash component”) and 3.2196 Lundin Mining Swedish Depository Receipts (“SDRs”) (the “share component”) for every 100 ARCON shares.

The cash component represented a value of approximately $65.3 million and the share component represented a value of approximately $56.3 million. The combined value of the offer was $121.6 million. As consideration for the share component, the Company issued an additional 5,621,239 common shares at a price of CAD$12.53 (US$10.02) per share, being the average closing price of the Company’s shares on the Toronto Stock Exchange the two days before, the day of, and two days after the date of announcement.

On April 12, 2005, the Directors of Lundin Mining announced that all of the conditions of the Merger Offer had been satisfied or waived and, accordingly, the Merger Offer was declared unconditional in all respects. ARCON was consolidated in the financial statements of Lundin Mining as of May 1, 2005. The acquisition of ARCON has been accounted for using the purchase method. The allocation of the fair value of the net assets acquired is as follows:
 


Purchase price:
Cash paid                                   $    65,277,000
Consideration paid with new shares               56,347,000
Acquisition expenses paid in cash                 5,347,000
                                            ---------------
                                            $   126,971,000
                                            ---------------


Net assets acquired:
Cash                                        $     2,251,000
Other working capital, net                      (15,030,000)
Mining properties                               135,657,000
Property, plant and equipment                    17,773,000
Other long-term receivables                       3,930,000
Other long-term liabilities                      (9,492,000)
Other provisions                                 (8,118,000)
                                            ---------------
                                            $   126,971,000
                                            ---------------
                                            ---------------

 


3. Agreement with Silver Wheaton Corporation

On December 8, 2004, the Company entered into an agreement with Silver Wheaton Corporation (“Silver Wheaton”) whereby the Company agreed to sell all of its silver production from the Zinkgruvan mine in Sweden to Silver Wheaton in consideration for an upfront cash payment of $50 million (CAD60.6 million), 6 million (post-consolidation) Silver Wheaton shares and 30 million Silver Wheaton share purchase warrants with an aggregate fair value of $22.8 million, plus a per ounce payment at a price equal to the lesser of (a) $3.90 (subject to a consumer price adjustment after three years) and (b) the then prevailing market price per ounce of silver.

During 2005 Zinkgruvan sold all of the shares and warrants in Silver Wheaton for net proceeds of approximately $37.1 million and a profit before tax of approximately $17.8 million.

The Company has agreed to deliver all silver produced from Zinkgruvan over the life of mine with a minimum of 40 million ounces of silver to be delivered to Silver Wheaton over a 25-year period. If at the end of the 25-year period, the Company has not delivered the agreed 40 million ounces, then it has agreed to pay to Silver Wheaton US$1.00 per ounce of silver not delivered.

The upfront cash payment of $50 million and the aggregate fair value of the shares and warrants of $22.8 million have been deferred in the balance sheet and are realized in the income statement when the actual deliveries of silver occur. The deferred per ounce amount which is realized in the income statement is based on deliveries of 40 million ounces and equals approximately $1.65 per ounce of silver delivered. Total revenue from silver currently equals approximately $5.55 per ounce, including $3.90 per ounce which is invoiced to Silver Wheaton upon delivery of silver.

4. Share capital

The authorized and issued share capital is as follows:

(a) Authorized:

Unlimited number of common shares with no par value and one special share with no par value.

Shares issued and outstanding
 


                                             Number of        Amount
                                                shares     (US $'000)
--------------------------------------------------------------------
Balance, December 31, 2004                  33,419,271       170,278
Shares issued to acquire shares in NAN       1,383,321        14,727
--------------------------------------------------------------------
Balance, March 31, 2005                     34,802,592       185,005
Shares issued to acquire shares in ARCON     5,621,239        57,430
Exercise of options                              2,000             8
--------------------------------------------------------------------
Balance, June 30, 2005                      40,425,831       242,443
Exercise of options                             53,000           353
--------------------------------------------------------------------
Balance, September 30, 2005                 40,478,831       242,796
Exercise of options                            215,000         1,004
Transfer of contributed surplus on
 exercise of stock options                           -           588
Translation adjustment                               -        (1,083)
--------------------------------------------------------------------
Balance, December 31, 2005                  40,693,831       243,305
--------------------------------------------------------------------
Balance, March 31, 2006                     40,693,831       243,305
Exercise of options                             67,500           661
Transfer of contributed surplus on
 exercise of stock options                           -           143
--------------------------------------------------------------------
Balance, June 30, 2006                      40,761,331       244,109
Exercise of options                            147,000         1,228
Transfer of contributed surplus on
 exercise of stock options                           -           402
--------------------------------------------------------------------
Balance, September 2006                     40,908,331       245,739

 


(b) Incentive stock options outstanding and held by directors, officers and employees of the Company are as follows:
 
                                                            Weighted-
                                                             Average
                                                            Exercise
                                             Number of         Price
Options                                         Shares        (CAD $)
--------------------------------------------------------------------
Outstanding at December 31, 2005               667,500      $  11.29
Granted in 2006                                 70,000      $  25.83
Exercised in 2006                             (214,500)     $   9.78
--------------------------------------------------------------------
Outstanding at September 30, 2006              523,000      $  21.88
--------------------------------------------------------------------


Expiry dates
------------------------------------------------------
April 12, 2007                                 225,000
August 8, 2007                                  85,000
November 8, 2007                               143,000
February 14, 2008                               45,000
April 9, 2008                                   25,000
------------------------------------------------------
Total                                          523,000
------------------------------------------------------

 


5. Related party transactions

During the three months ended September 30, 2006, and September 30, 2005, charges from a company owned by the Chairman of the Company for management and administrative services were $45,000 and $45,000 respectively. For the nine months period ended September 30, 2006 and September 30, 2005, the corresponding amounts were $135,000 and $129,400.

6. Guarantees

During 2006, a major Swedish bank has issued a bank guarantee of SEK 80 million (approx. $10.9 million) related to the future reclamation costs at Zinkgruvan. The beneficiary of the guarantee is the Swedish authorities. Lundin Mining has agreed to indemnify the Swedish bank for the corresponding amount of the guarantee.

7. Segmented Information

The Company is currently engaged in one operating segment, mining, exploration and development of mineral properties, primarily in Sweden and in Ireland. Geographic segmented information is as follows:
 


                            Three months ended           Nine months ended
--------------------------------------------------------------------------
In thousands
 of United          September 30, September 30, September 30, September 30,
 States dollars             2006          2005          2006          2005
--------------------------------------------------------------------------
Sales
Sweden                    65,409        23,422       222,503       102,992
Ireland                   33,532        25,261        81,154        25,261
--------------------------------------------------------------------------
                          98,941        48,683       303,657       128,253
                    ------------------------------------------------------
                    ------------------------------------------------------


Total assets
Sweden                   368,110       253,674       368,110       253,674
Ireland                  155,684       151,893       155,684       151,893
Canada                    22,547        10,572        22,547        10,572
--------------------------------------------------------------------------
                          546,341      416,139       546,341       416,139
                    ------------------------------------------------------
                    ------------------------------------------------------

 


8. Commitments

The Ozernoe project

Lundin Mining announced, on June 29, 2006, that the Company had signed a letter of intent to acquire a 49% interest in the Russian Ozernoe zinc project from IFC Metropol. The Company finalized negotiations with Metropol in September and the two parties have agreed on the terms of the transaction.

Upon completion of the transaction, a joint venture company will be formed in which Lundin Mining will hold a 49% interest and Metropol will hold a 51% interest. Activities of the joint venture company will be the subject of a shareholders agreement. The consideration for 49% interest will be $125 million of which $2 million has been paid and $113 million is payable upon closing of the transaction of which a portion (approximately $10 million) will be used to take the project towards a bankable feasibility study. The remaining $10 million is payable when the project goes into commercial production. The final purchase price is subject to adjustments based on recoverable zinc metal from a resource estimate classified and reported in compliance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) confirmed by the bankable feasibility study. This acquisition is subject to all requisite regulatory approvals.

9. Subsequent event

Merger between Lundin Mining Corporation and Eurozinc Mining Corporation

On August 21, 2006, Lundin Mining and EuroZinc announced that they had entered into a definitive agreement to merge the two companies to create a new global mining company.

On October 19, 2006, Lundin Mining and EuroZinc announced that the merger had been approved by the shareholders of each of the companies at Special Meetings of Shareholders. The transaction was executed through a plan of arrangement. The transaction closed on October 31, 2006 and all EuroZinc common shares were automatically exchanged at a ratio of 0.0952 Lundin Mining common shares for each EuroZinc common share plus a cash component of $0.01 for each 100 EuroZinc common shares. Lundin Mining shareholders continued to hold their existing common shares. As of the date of closing approximately 53,611,516 new Lundin Mining shares were issued to the EuroZinc shareholders. The former EuroZinc shareholders own approximately 56.7% of the combined company as of the date of closing, not including the Lundin Mining shares to be issued on the exercise of the previously outstanding EuroZinc options.

The combined company is called Lundin Mining Corporation and created one of the North American and Eurpean markets’ premier, diversified copper and zinc producers. The combined company is listed on the Toronto (TSX), Stockholm (OMX) and New York (AMEX) stock exchanges.

SUPPLEMENTARY INFORMATION (UNAUDITED)

Significant differences between Canadian Generally Accepted Accounting Principles (“Canadian GAAP”) and International Financial Reporting Standards (“IFRS”)/International Accounting Standards (“IAS”).

The shares of Lundin Mining trade on the Toronto Stock Exchange and the Stockholm Stock Exchange (“SSE”). Most companies that trade on the SSE are required to report according to IFRS/IAS. However, as a Canadian company, Lundin Mining is required to report according to Canadian GAAP. The Company has reviewed the differences between Canadian GAAP and IFRS/IAS and has identified the following items which would or may have a significant impact on the financial statements of Lundin Mining.

According to IFRS 3, future costs such as restructuring items, which are expected to occur subsequent to an acquisition, should not be provided for in the purchase price allocation. Instead, these costs should be realized in the income statement when the costs actually occur. However, according to Canadian GAAP, restructuring costs that are expected to occur as a result of an acquisition should be provided for in the purchase price allocation. Restructuring costs that arose during 2005, as a result of the acquisitions of NAN and ARCON, in the amount of $2.1 million, have been provided for in the purchase price allocations.

According to Canadian GAAP, impairment test of assets should be carried out by comparing the future cash flows of the assets to their carrying values. Future cash flows are dependent on a number of assumptions, including, among other things, future metal prices, exchange rates and discount rates. According to Canadian GAAP, future cash flows should be based on undiscounted values. Lundin Mining believes that the future cash flows from the Company’s assets exceed their carrying values and, accordingly, no write downs are necessary. According to IAS 36, the future cash flows would be based on discounted values.

According to Canadian GAAP, the investments the Company holds in other companies should be valued at the lower of cost or fair market value. However, according to IAS 39, these investments would be recorded at fair market value. The fair market value, as at September 30 2006, was $25.5 million, which exceeded the carried cost value by $2.1 million.

SUPPLEMENTARY INFORMATION REGARDING NEVES CORVO
 


Neves Corvo Mine
                                                                      Year
                     Three months ended       Nine months ended      ended
(100 PERCENT OF      Sept 30,   Sept 30,    Sept 30,    Sept 30,    Dec 31,
 PRODUCTION)            2006       2005        2006        2005       2005
--------------------------------------------------------------------------
Ore milled
 (tonnes)            539,121    521,885   1,548,992   1,548,023  2,056,409
--------------------------------------------------------------------------
Grades per tonne
Copper (%)               4.5        4.8         4.6         5.0        5.0
Zinc (%)                 8.0          -         8.0           -          -
--------------------------------------------------------------------------
Recoveries
Copper (%)                88         89          89          88         88
Zinc (%)                  50          -          50           -          -
--------------------------------------------------------------------------
Production
Copper (tonnes)       18,574     22,127      59,951      68,572     89,474
Zinc (tonnes)          3,019          -       3,019           -          -

 


For further financial information regarding Neves Corvo, please see EuroZinc’s nine months 2006 report filed onwww.sedar.com

OTHER SUPPLEMENTARY INFORMATION
 


1. List of directors and officers at November 8, 2006:
(a) Directors:
    Brian D. Edgar
    Colin K. Benner, CEO and Vice Chairman
    Dale C. Peniuk
    David F. Mullen
    Donald K. Charter
    Graham Mascall
    John H. Craig
    Lukas H. Lundin, Chairman
    William A. Rand
    Tony O'Reilly Jnr


(b) Officers:
    Lukas H. Lundin, Chairman
    Colin K. Benner, CEO and Vice Chairman
    Karl-Axel Waplan, President and Chief Operating Officer
    Anders Haker, Vice President and Chief Financial Officer
    Neil O'Brien, Vice President of Exploration
    Manfred Lindvall, Vice President Environment, Health and Safety
    Joao Carrelo, Executive Vice President and Chief Operating Officer of
     Portugal and Spain
    Kjell Larsson, Vice President Projects and the Operations in Ireland
     and in Sweden
    Kevin Hisko, Corporate Secretary


2. Financial information


    The report for the fourth quarter 2006 will be published on
    February 22, 2007.


3. Other information
    Address (Vancouver office):
    Lundin Mining Corporation
    Suite 2101
    885 West Georgia Street
    Vancouver B.C. V6C 3E8
    Canada


    Telephone: +1 604 689 7842
    Fax: +1 604 689 4250


    Address (Sweden office):
    Lundin Mining AB
    Hovslagargatan 5
    SE-111 48 Stockholm
    Sweden


    Telephone: +46 8 545 074 70
    Fax: +46 8 545 074 71


    Website: www.lundinmining.com.


    The corporate number of the Company is 306723-8.

 
 



FOR FURTHER INFORMATION PLEASE CONTACT:

Lundin Mining Corporation
Karl-Axel Waplan
President and COO
+46-705-10 42 39
Email: ka.waplan@lundinmining.com

or

Lundin Mining Corporation
Anders Haker
Vice President and CFO
+46-708-10 85 59
Email: anders.haker@lundinmining.com

or

Lundin Mining Corporation
Catarina Ihre
Manager, Investor Relations
+46-706-07 92 63
Email: catarina.ihre@lundinmining.com

or

Lundin Mining Corporation
Sophia Shane
Investor Relations
(604) 689-7842
Email: sophias@namdo.com
Website: www.lundinmining.com