News
Lundin Mining Reports More High Grade Drill Results From Lombador Exploration
As was announced on October 5, 2007, the Company’s Board of Directors has approved an expansion program that will accelerate the development of this large, high-grade zinc resource. Recent drill holes from the ongoing resource definition drill program continue to intersect wide zones of high-grade zinc mineralization, confirming the potential of this zone to provide additional resources to the Company’s resource inventory.
A complete summary table showing the results of the 2007 drill holes along with a longitudinal section showing the relative positions of the massive sulphide intercepts with respect to the Lombador deposit is attached to this release and provided on the Company’s website at www.lundinmining.com. Recent intercepts are summarized in the table below.
--------------------------------------------------------------------------- Est. True From Interval Width Drillhole (m) To (m) (m) (m) Cu % Pb % Zn % --------------------------------------------------------------------------- NE16 673.2 686.0 12.8 12.0 2.08 0.48 0.08 plus 687.0 694.2 7.2 7.0 0.23 1.75 5.66 --------------------------------------------------------------------------- NF22A-1 901.0 936.0 35.0 35.0 0.30 0.68 7.65 incl. 907.0 919.0 12.0 12.0 0.28 1.51 13.65 plus 943.8 948.0 4.2 4.2 2.23 0.08 0.20 --------------------------------------------------------------------------- NF24 902.0 960.0 58.0 58.0 0.36 2.61 8.72 incl. 914.0 947.0 33.0 33.0 0.28 3.84 11.42 plus 964.0 988.1 24.1 24.0 1.17 0.05 0.19 --------------------------------------------------------------------------- NF24A-1 893.0 938.5 45.5 45.5 0.34 2.49 9.01 incl. 899.0 922.0 23.0 23.0 0.28 4.04 12.70 plus 944.3 962.0 17.7 17.7 2.51 0.55 2.07 --------------------------------------------------------------------------- NF34(i) 1,151.8 1,219.0 67.2 67.0 0.31 2.93 8.03 incl. 1,168.0 1,189.0 21.0 21.0 0.29 3.99 11.13 plus 1,243.0 1,259.0 16.0 16.0 3.92 0.10 0.32 incl. 1,251.0 1,255.0 4.0 4.0 8.72 0.15 0.31 --------------------------------------------------------------------------- (i) previously released on August 14, 2007
The Lombador zinc zone is a continuous zone of zinc mineralization contained within the much larger Lombador massive sulphide lens. Internal continuity of the zone is proving to be excellent. Both the massive sulphide lens and the zinc zone remain open at depth, and NF34 is the deepest hole drilled into the zone to date.
This zone has so far been intersected by 21 drill holes covering an area which extends at least 620 metres along the dip of the deposit, from 600 metres below surface to 1,000 metres below surface. The lowermost underground development at Neves Corvo is currently 700 metres below surface. The zone extends at least 300 metres along strike.
In addition to the zinc mineralization, several of the holes drilled into this zone have encountered copper mineralization below the zinc mineralization. Hole NF34 intersected a 16 metre interval grading 3.92% copper in stockwork mineralization beneath the massive sulphide lens. This copper zone remains open for expansion along strike and down dip.
Ongoing drilling will continue to search for the limits of the Lombador zinc zone, and to test for other, undiscovered zones of high grade zinc and copper mineralization within the Lombador sulphide lens.
About Lundin Mining
Lundin Mining is a rapidly growing mining and exploration company engaged internationally in the extraction, development, acquisition and discovery of base metal deposits. The company currently owns five operating mines, extracting copper, zinc, lead, nickel and silver: Neves-Corvo in Portugal, the Zinkgruvan and Storliden mines in Sweden, the Galmoy mine in Ireland and the recently acquired Aguablanca mine in Spain. A further mine, the Aljustrel mine in Portugal, is under development and will be brought into production in the fourth quarter 2007. In addition, Lundin Mining holds an extensive exploration portfolio, including interests in international ventures and development projects such as the world class Tenke Fungurume copper/cobalt project in the Democratic Republic of Congo, which is currently under construction and the Ozernoe zinc project under detailed feasibility study in Russia.
Drill core was logged, split and sampled by Company personnel at its facilities on the Neves Corvo mine property in Portugal. Samples were subsequently bagged, sealed and shipped under the custody of Company personnel to the Company’s assay laboratory at the nearby minesite where the samples were prepared and analyzed by standard industry-recognized assay methods. The drill program and technical data are under the management of Bob Carmichael who is the Qualified Person pursuant to National Instrument 43-101 and has reviewed and verified the technical information contained in this news release.
Certain of the statements made and information contained herein is “forward-looking information” within the meaning of the Ontario Securities Act or “forward-looking statements” within the meaning of Section 21E of the Securities Exchange Act of 1934 of the United States. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the companies’ expectations; the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; uncertain political and economic environments; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; and other risks and uncertainties, including those described under Risk Factors Relating to the Company’s Business in the Company’s Annual Information Form and in each management discussion and analysis. Forward-looking information is in addition based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of copper and zinc; that the companies can access financing, appropriate equipment and sufficient labour and that the political environment where the Companies operate will continue to support the development and operation of mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements.
Lombador Deposit 2007 Drill Results --------------------------------------------------------------------------- Est. True From Interval Width Drillhole (m) To (m) (m) (m) Cu % Pb % Zn % --------------------------------------------------------------------------- ND20A 658.0 666.0 8.0 8.0 0.20 0.80 6.81 plus 738.0 752.0 14.0 14.0 0.30 1.76 9.82 --------------------------------------------------------------------------- ND20A-1 696.0 731.0 35.0 34.0 0.35 3.16 9.44 --------------------------------------------------------------------------- ND22 798.0 822.2 24.2 23.4 No Significant Values --------------------------------------------------------------------------- ND22-1 808.0 812.0 4.0 4.0 0.39 0.17 5.88 plus 828.0 830.4 2.4 2.4 1.60 0.51 2.66 --------------------------------------------------------------------------- NE16 673.2 686.0 12.8 12.0 2.08 0.48 0.08 plus 687.0 694.2 7.2 7.0 0.23 1.75 5.66 --------------------------------------------------------------------------- NE18B-1 619.9 626.7 6.8 6.5 0.18 1.04 4.71 --------------------------------------------------------------------------- NE18C 712.9 719.0 6.1 6.1 5.38 0.44 0.02 plus 731.0 744.4 13.4 13.4 1.20 1.46 6.22 --------------------------------------------------------------------------- NE18C-1 627.8 633.0 5.2 0.27 2.61 6.09 --------------------------------------------------------------------------- NE18C-2 626.5 628.4 1.9 1.8 0.17 2.57 6.29 plus 729.5 735.8 6.3 6.2 2.43 2.95 0.08 plus 743.8 763.2 19.4 19.2 0.38 2.07 7.21 --------------------------------------------------------------------------- NE18C-3 741.3 745.0 3.7 3.5 1.52 1.38 0.07 plus 747.0 777.0 30.0 28.0 0.46 2.51 8.11 incl. 766.0 776.0 10.0 9.3 0.35 4.46 12.90 --------------------------------------------------------------------------- NF22A 911.0 966.0 55.0 53.0 0.35 2.47 8.51 incl. 922.0 950.0 28.0 27.0 0.29 3.96 11.07 --------------------------------------------------------------------------- NF22A-1 901.0 936.0 35.0 35.0 0.30 0.68 7.65 incl. 907.0 919.0 12.0 12.0 0.28 1.51 13.65 plus 943.8 948.0 4.2 4.2 2.23 0.08 0.20 --------------------------------------------------------------------------- NF24 902.0 960.0 58.0 58.0 0.36 2.61 8.72 incl. 914.0 947.0 33.0 33.0 0.28 3.84 11.42 plus 964.0 988.1 24.1 24.0 1.17 0.05 0.19 --------------------------------------------------------------------------- NF24A-1 893.0 938.5 45.5 45.5 0.34 2.49 9.01 incl. 899.0 922.0 23.0 23.0 0.28 4.04 12.70 plus 944.3 962.0 17.7 17.7 2.51 0.55 2.07 --------------------------------------------------------------------------- NF34 1,151.8 1,219.0 67.2 67.0 0.31 2.93 8.03 incl. 1,168.0 1,189.0 21.0 21.0 0.29 3.99 11.13 plus 1,243.0 1,259.0 16.0 16.0 3.92 0.10 0.32 incl. 1,251.0 1,255.0 4.0 4.0 8.72 0.15 0.31 --------------------------------------------------------------------------- NG18 820.8 823.3 2.5 2.5 2.51 0.18 0.04 plus 838.2 841.6 3.4 3.4 0.40 0.49 3.87 plus 846.6 850.0 3.4 3.4 2.60 1.03 3.32 --------------------------------------------------------------------------- NG18-1 796.5 823.0 26.5 25.0 0.73 0.61 5.67 incl. 814.5 822.0 7.5 7.1 0.79 1.19 7.19 --------------------------------------------------------------------------- NG20 863.0 895.0 32.0 30.4 0.46 2.44 9.82 plus 917.0 925.0 8.0 7.6 2.57 0.22 0.76 --------------------------------------------------------------------------- NG22 927.5 944.0 16.5 16.5 0.45 1.24 8.68 --------------------------------------------------------------------------- NG22A 946.8 950.2 3.4 No Significant Values --------------------------------------------------------------------------- NG22B 968.6 996.3 27.7 No Significant Values --------------------------------------------------------------------------- NH28 Abandoned --------------------------------------------------------------------------- NI18B-1 907.0 920.6 13.6 13.0 1.47 0.55 6.05 --------------------------------------------------------------------------- NK22A-1 1,076.0 1,121.7 45.7 43.7 0.43 1.51 4.44 --------------------------------------------------------------------------- NB30 Assays Pending NK22A-1 Complete Assays Pending NM16A-1 Assays Pending NF24B Assays Pending NE28 Assays Pending NI30 In Progress NF26B In Progress ---------------------------------------------------------------------------
NOTE: To view the Lombador Deposit map, please visit the following link: http://www.ccnmatthews.com/docs/lun1011.pdf
FOR FURTHER INFORMATION PLEASE CONTACT:
Lundin Mining Corporation
Neil O’Brien
Senior Vice President Exploration and Business Development
(778) 991-4714
or
Lundin Mining Corporation
Catarina Ihre
Manager, Investor Relations
+46-70-607-9263
or
Lundin Mining Corporation
Sophia Shane
Investor Relations, North America
(604) 689-7842
(604) 689-4250 (FAX)
Website: www.lundinmining.com